Valerija Posted April 19, 2015 Report Posted April 19, 2015 Hi, I have a course work where I should suggest geophysical methods for the investigation for the construction of the rock tunnel. I know the location of the tectonic zone and I need to investigate soil conditions and bedrock quality. Unfortunately I have no previous experience with geology. Hence, would like to get some suggestions, please. Tunnel depth will be between 30 and 100 m below the ground. It is known that soil depth is 3 - 10 m and it mainly consists of till, sometimes covered by peat. Minor areas consist of sand and gravel. Gneiss is dominating rock type and it can be cut by amphibolite dykes. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.